The ISO Generator Interconnection Procedures (ISO Tariff DD Appendix 5) requires participating transmission owners to annually update and publish per unit costs for use during the current interconnection study cycle for estimating the cost of facilities required to interconnect generation. Per unit costs are used to develop the cost for reliability and delivery network upgrades and participating transmission owner’s interconnection facilities. The ISO annually publishes draft per unit costs to its website, holds a stakeholder meeting and allows stakeholders to comment on the draft costs. The ISO publishes the final costs in the March to April time frame. The schedule for this annual process is located in Appendix 5 of the interconnection procedures.
Development | Decision | Implementation | Completed/Closed |
---|---|---|---|
Sep 18, 2023 Final cost guides posted
|
Completed |
|
DCRT 2023 Final Per Unit Cost Guide 09/18/2023
DSLK 2023 Final Per Unit Cost Guide 09/18/2023
GLW 2023 Final Per Unit Cost Guide 09/18/2023
PGAE 2023 Final Per Unit Cost Guide 09/18/2023
SCE 2023 Final Per Unit Cost Guide 09/18/2023
SDGE 2023 Final Per Unit Cost Guide 09/18/2023
VEA 2023 Final Per Unit Cost Guide 09/18/2023
|
|
Web meeting |
Video - 2023 Participating Transmission Owner Per Unit Costs - Aug 29, 2023 08/31/2023
Presentation - 2023 Participating Transmission Owner Per Unit Costs - Aug 29, 2023 08/28/2023
|
|
|
DCRT 2023 Draft Per Unit Cost Guide 08/02/2023
DSLK 2023 Draft Per Unit Cost Guide 08/02/2023
GLW 2023 Draft Per Unit Cost Guide 08/02/2023
PGAE 2023 Draft Per Unit Cost Guide 08/02/2023
SCE 2023 Draft Per Unit Cost Guide 08/02/2023
SDGE 2023 Draft Per Unit Cost Guide 08/02/2023
VEA 2023 Draft Per Unit Cost Guide 08/31/2023
|