The ISO performs annual studies to identify the minimum local resource capacity required in each local area to meet established reliability criteria. As part of this study process, the ISO obtains input from stakeholders on the criteria, methodology and assumptions used as inputs into the studies, and feedback on the study results. Based on the study results, load serving entities receive a proportional allocation of the minimum required local resource capacity by transmission access charge area, and submit resource adequacy plans to show that they have procured the necessary capacity.

Status

Development Decision Implementation Completed/Closed
Apr 28, 2022 Final 2023 and 2027 technical reports posted
Completed

Activities

Technical reports


Final 2023 Local Capacity Technical Report

Final 2027 Long-Term Local Capacity Technical Report

Attachment A - List of Physical Resources Accounted for in the 2023 and 2027 Local Capacity Technical Studies

Draft 2023 Local Capacity Technical Report

Draft 2027 Long-Term Local Capacity Technical Report

Study manuals


2023 Local Capacity Requirements Final Study Manual

2023 Local Capacity Requirements Draft Study Manual

Web meeting


ISO Responses to Comments - Final 2023 and 2027 Local Capacity Requirement Study Results

Agenda - 2023 and 2027 Local Capacity Requirements Apr 12, 2022

Overall Summary of Findings - Final 2023 and 2027 Local Capacity Requirements

Presentation - Final 2023 and 2027 LCR Humboldt Local Area - Apr 12, 2022

Presentation - Final 2023 and 2027 LCR NCNB Local Area - Apr 12, 2022

Presentation - Final 2023 and 2027 LCR Bay Area Local Area - Apr 12, 2022

Presentation - Final 2023 and 2027 LCR Sierra Local Area - Apr 12, 2022

Presentation - Final 2023 and 2027 LCR Stockton Local Area - Apr 12, 2022

Presentation - Final 2023 and 2027 LCR Fresno Local Area - Apr 12, 2022

Presentation - Final 2023 and 2027 LCR Kern Local Area - Apr 12, 2022

Presentation - Final 2023 and 2027 LCR Big Creek-Ventura Local Area - Apr 12, 2022

Presentation - Final 2023 and 2027 LCR LA Basin and San Diego-Imperial Valley Local Areas - Apr 12, 2022

Presentation - Final 2023 and 2027 LCR San Diego Non-Bulk Sub-areas - Apr 12, 2022

Presentation - Energy Storage Assessment - Apr 12, 2022

View comments

Web meeting


ISO Responses to Comments - Draft 2023 and 2027 Local Capacity Requirement Study Results

Agenda - 2023 and 2027 Local Capacity Requirements Mar 9, 2022

Overall Summary of Findings - Draft 2023 and 2027 Local Capacity Requirements

Presentation - Draft 2023 and 2027 LCR Humboldt Local Area - Mar 9, 2022

Presentation - Draft 2023 and 2027 LCR NCNB Local Area - Mar 9, 2022

Presentation - Draft 2023 and 2027 LCR Bay Area Local Area - Mar 9, 2022

Presentation - Draft 2023 and 2027 LCR Sierra Local Area - Mar 9, 2022

Presentation - Draft 2023 and 2027 LCR Stockton Local Area - Mar 9, 2022

Presentation - Draft 2023 and 2027 LCR Fresno Local Area - Mar 9, 2022

Presentation - Draft 2023 and 2027 LCR Kern Local Area - Mar 9, 2022

Presentation - Draft 2023 and 2027 LCR Big Creek-Ventura Local Area - Mar 9, 2022

Presentation - Draft 2023 and 2027 LCR LA Basin and San Diego-Imperial Valley Local Areas - Mar 9, 2022

Presentation – Draft 2023 and 2027 LCR San Diego Non-Bulk Sub-areas - Mar 9, 2022

View comments

Web meeting


ISO Responses to Comments - 2023 Local Capacity Requirements Draft Study Manual

Presentation - 2023 Local Capacity Technical Study Criteria Methodology and Assumptions

View comments